Well it has now been a week since I began the renovation of our Master Shower.  Quite a bit of progress has been made.  The carpentry is done.  I finished the plumbing on Thursday.  Due to some unusual choices by the builder the plumbing on this turned out to be a little more involved than I hoped.  But after a trip to Home Depot to confir with a retired plumber there I did get it done.  Maybe not as elegant as I would have liked but it should be stable and moved the plumbing back insde the wall where it needed to be.


I finally got the old shower pan out.


New framing with lower ceiling


Some interesting plumbing the pipe has been moved close enough to the floor for the shower bed to cover it.  Much cussing and discussing involved in this move.  I don't really like to do plumbing and this was a bit like a jig saw puzzle but in the end no leaks and the faucets all work correctly.


The Tile Backer board going in and you can see the can lights are in


And on a lighter note.  Smokey decided he needed a time out recently.  He sat like this facing the wall for quite a while.  We never found out what he was doing penance for.

More Later:

Bruce and Pam

No comments:

Post a Comment